Monday Maritime Matters
January 14th, 2008 by xformed
Extra reading: And what is a skyhook?” From Eagle1 and Fred Fry International Maritime Monday 93!
——————————————
Here is the new course of Monday Maritime Matters I promised, brought on by non-coincidental coincidence. That led me to a story about sea going vessels that, like the well done “Six Frigates” by Ian Toll, is far more than a story of the Navy; It’s a story of business, shipbuilding, pre-WWII political and economic history, with seamanship on linland waterways tossed in.
The book is a study in the men, machinery and families who made this happen, covering the excellent foresight of the shipyard owners, who not only built ferries and ore ships, but cranes and specialized shipbuilding machinery to keep the skilled workforce in place, so when this requirement arose, they were up to the challenge, and, as it turned out, were able to deliver the boats faster than Electric Boat! Bonus information includes details of the operations of the river pilots and tow skippers, along with the issues of navigating rivers.
The Navy was so impressed with the early performance, a second contract, for more subs was ordered, before the first sub was built. Toss in the complication that the war had now begun and the strategic imperative took on a entirely new meaning. The story proceeds to tell of the complications of building up a work force, getting skilled labor in place to augment the generational workers already there. Building special jigs to rotate the 9 hull sections to allow welders to work in the best position for the best quality of their beads. Later, a third contract was given to the Manitowoc company, too.
The Navy then tasked, in February 1942, out of the blue, the construction of 450 LCT-5 craft to support amphibious landings. Later, the added requirement came to design and build the LCT-6s. Toss in a contract to build 6000 cranes for the Navy and Army for forward deployment, all as a result of keeping a company positioned and ready to aggressively take on new tasks with great efficiency.
A total of 28 submarines were built, short of the 41 tasked in original contracts, because it became apparent the war was coming to a close. The 28th submarine, the USS MERO (SS-378) wasn’t commissioned in time to reach the war zone and was tasked with conducting a public affairs cruise around the Great Lakes so the people could get a good look at what they had helped to build.
The book discusses, in depth, the specifications of the contracts, the interactions with Electric Boat, the costs and profits, equipment provided, special items and arrangements, and the transit of the USS PETO (SS-265) (the first Manitowoc boat) to the Gulf of Mexico and Panama for combat training. Interaction with the on site SUPSHIP reps and descriptions of the commissioning parties are there, too (complete with commentary reminiscent of my own experience in Pascagoula, MS).
The boats earned a reputation among the crews who took them into combat, and the maintenance units who serviced them as well built hulls, constructed with the understanding sailors lives were at risk.
RADM Nelson completes the story with some excellent analysis of the contract performance, showing specifics of costs, profits and the associated issues in the financial realm.
I highly recommend this book, not because it is a book on submarines, but because it is a wonderful case study of a business that grew and thrived in bad times and good, and when they had to perform, they successfully adapted and exceeded expectations. In the early part of the book, the story of the national mood and decisions regarding the size of the Navy, puts the history of the Navy in context for the time between WWI and II. Some details of the difficulties facing our submariners in the combat theater are also discussed, in the context of how the shipyard managed to re-engineer the dive planes and some other system to allow faster diving times and periscope vibration problems.
The company lives on today, still with it’s hand in the shipbuilding/repair business and building cranes, among other diversified operations, such as a major operation in food service machines. Checking this page, the Manitowoc Company currently has it’s hand in the LCS project, building improved lighterage barges for the Navy and the construction of USCG Great Lakes Icebreakers.
Not only is this book available from Amazon, I also found this site, Submarine Books, that has a lengthy list of books on submarines, old and new!
This entry was posted on Monday, January 14th, 2008 at 12:01 am and is filed under Economics, History, Leadership, Maritime Matters, Military, Military History, Navy, Political, Technology. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.